Coleg Cambria Construction Workshop Dust Suppression System – Connah’s Quay Educational Facility
Advanced Dust Control Technology Supports Safe Construction Training at Leading UK College
Challenge:
Coleg Cambria, one of the UK’s largest colleges serving 6,000 full-time students and 20,000 part-time learners, required effective dust control in their newly refurbished construction workshops. The facility needed controllable dust suppression across multiple teaching classrooms and mixing areas to protect students and staff during hands-on construction training, while ensuring the system could handle varying dust levels from regular lessons to intensive demolition and clean up activities.

Location | Connah's Quay, Wales, United Kingdom |
---|---|
Customer | Coleg Cambria |
Sector | Education & Training / Construction Education |
The Mist-air Solution:
Mist-air installed a comprehensive dust suppression system in 2020 featuring fan-assisted manifolds positioned in the roof space. The system delivers dry fog suppression with flexible operational modes – intermittent settings for regular lessons that can easily switch to constant operation during demolition and sweep-up activities. Security features include lockable switches to prevent tampering by unauthorized users, ensuring consistent system integrity in the educational environment.
Get In Touch
